In addition, commercial buildings shall comply with Section C406 and tenant spaces shall comply with Section C406.1.1. HTML PDF: 51-11C-40602: Section C406.2—HVAC option. 2006 Washington State Nonresidential Energy Code Compliance Form Interior Lighting Summary (back) LTG-INT 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Prescriptive Spaces Occupancy: Qualification Checklist 1. Commercial Provision Chapters 1 - 5 of the 2015 Washington State Energy Code apply to all commercial occupancies, R-2, R-3 and R-4 occupancies greater than 3 stories above grade, and R-1 occupancy (all building heights). Review and understand the envelope requirements outlined in the WSEC, including new required Energy Efficiency Options (Section C406) and updated 3rd party compliance worksheets. The building energy cost shall be equal to or less than 85 percent of the standard reference design building. Note 3 - Exemptions For Low Energy Spaces - Low Energy spaces are exempt from all provisions in WSEC Section C402 Building Envelo pe, however all other applicable pr ovisions in the Code do apply including lighti ng, mechanical, service water heating, etc. Multifamily buildings greater than three stories: State the additional credit chosen from the 2015 WSEC C406—Additional efficiency package options. Pool and Spa Functional Testing has been completed (Section C408.4.1.3) Pools and spas have been tested to ensure service water heating equipment, time switches and heat recovery equipment are calibrated, adjusted and operate in accordance with approved plans and specifications Metering System Functional Testing has been completed (Section C408.5.1) Energy source meters, energy end-use … HTML PDF: 51-11C-40604: Section C406.4—Lighting controls option. Teams that implement a high-performance, dedicated outdoor air system (DOAS) per Section C406.7 on the same building type will earn just four credits, requiring the team to seek more credits using another option. 3. New buildings and changes in space conditioning, change of occupancy and building additions in accordance with Chapter 5 shall comply with sufficient packages from Table C406.1 so as to achieve a minimum number of 6 credits. More Efficient Lighting System. to include with a Prescriptive submitta l: All applicable ENV, LTG, MECH and C406. Thermal Performance: Modeling & Bridging. The 2015 WSEC section R402.4.1.2 requires air leakage testing for ALL new houses and additions. luminaire with embedded occupancy and daylight sensors) for each luminaire. 8. lighting control system conforming to section C406.4, or shall contain luminaire-level lighting controls (i.e. Pascal is a measurement of pressure. in accordance with the 2015 washington state energy code (wsec) section c408 building commissioning shall be completed for mechanical systems* (c403), service water heating systems (c404), controlled receptacles and lighting systems (c405), energy metering (c409), and refrigeration (c410). When adopted by the local jurisdiction, the requirements of Appendix F, Outcome-Based … … HTML PDF: 51-11C-40605: Section C406.5—On-site renewable energy option. The requirement is met if the structure has a leakage rate of 5 air changes per hour (5 ACH) when depressurized with a blower to 50 Pascals or less. C409.4.4 Commissioning. The requirements of Sections C402.5, C403.2, C404, C405.2, C405.3, C405.5, C405.6 and C407. More Efficient Lighting System. SDCI Closures, Service Updates, and Inspection Requirements. It was also broken into two additional subsections (C406.1.1.1, Applicable envelope and on-site renewables and C406.1.1.2, Applicable HVAC & service water) to help clarify intent and application for tenant spaces and tenant improvement. C406.7 (High Performance DOAS Option) requires combined fan power less than 0.5 watt/cfm of outdoor air (2 cfm/watt), with no static pressure requirement. [Statutory Authority: RCW 19.27A.020, 19.27A.025, 19.27A.160 and chapter 19.27 RCW. This file, ENV15-v4.XLSM, has electronic compliance forms for general project information including Section C406, and envelope provisions as defined in Sections C101, C303, C402, C406, Chapter 5 (existing buildings) and Appendix A (default values) for Climate Zones 4c and 5b. Proposed revisions in red. ENERGY CONSUMPTION MANAGEMENT. SECTION C407 TOTAL BUILDING PERFORMANCE. C406 –Additional efficiency package options ... 2015 IMC Section C403.2 Outdoor air required IMC Table 403.3 Minimum Ventilation Rates WA State Amendment allows ASHRAE 62.1 as an alternate method. Schedule this Session. Section C406. Parcel Owner Address; 420042400000 THE RIDGE MOTOR SPORTS GROUP LLC 1060 W EELLS HILL RD MASON COUNTY, WA 98584 The requirements of Section C407. Onsite Renewables . WSR 19-24-040, § 51-11C-405021, filed 11/26/19, effective 7/1/20. C403.3 Economizers . Statutory Authority: RCW 19.27A.025, 19.27A.160, and 19.27.074. Section C406. There are two companion files: LTG15-v4.XLSM (Section C405 lighting and electrical systems), and MECH15 … The Washington State Energy Code (WSEC) 2015 is a residential and commercial building energy code based on the IECC which has been adopted by many states and municipalities. 43. HTML PDF: 51-11C-40603: Section C406.3—LPA option. Required for all service corridors and fire-rated stairwells. ICC Digital Codes is the largest provider of model codes, custom codes and standards used worldwide to construct safe, sustainable, affordable and resilient structures. Compliance with 2015 Washington State Energy Code - Plan Review Permit Center, To the best of my knowledge, this building Complies with the Washington State Non-Residential Energy Code with the following required changes and/or clarifications: Included in this submittal are copies of the forms for Envelope, Mechanical, and Lighting. The intention of this code is to reduce energy consumption by outlining design and construction requirements which include specific constraints for lighting controls. Energy metering and energy consumption management systems shall be commissioned in accordance with Section … C406.1.1 Tenant spaces, the language was clarified and harmonized with that in Section C406.1. Washington State Energy Code (WSEC) For a formatted copy of the WSEC, scroll down to the Energy Code section to locate PDF files that are free to download. New in WSEC - Shall be configured to provide no greater than 150% of minimum ventilation rate to each zone per 2015 IMC or other applicable code (OSHA, WAC), whichever is greater. C403.7 –High eff VAV systems Effective July 1, 2017 For HVAC systems subject to the requirements of Section C403.6 but utilizing Exception 2 of that section, a high performance VAV system may be provided … C401.2.1 Application to Replacement Fenestration Products . OR Attach the 2015 WSEC section R405.3 Performance-based compliance cover sheet demonstrating an additional 7% reduction in energy use compared to code. See pages 3-10 for proposed changes. Also required for non-service corridors, non-fire-rated stairwells, and library stacks, if occupancy sensors are used to control the lighting. Load calculation summary MECH-LOAD-CALC Form Provide design load calculations for all mechanical systems and equipment serving the building heating, cooling or ventilating needs. 2. SECTION C408 SYSTEM COMMISSIONING. a. Image result for iecc 2012. Section C406—Efficiency packages. All portions of stairways shall remain illuminated to meet the requirements of Section 1009 of the International Building Code when the lighting power is reduced. For example, by achieving enhanced envelope performance per Section C406.10c on a Group R-2 building, project teams will earn all six credits needed. 249 Pascals are equal to 1” of water column. SECTION C409 ENERGY METERING AND. For exempt lighting, note section and exception number, and leave Watts/Fixture blank. Below are several editorial changes to the 2018 WSEC draft. C406: Additional Efficiency Package Options: 2 points ... requirements of Section C403.2.6.1 dedicated outdoor air systems, equipment and controls shall be configured to cycle off zone heating and cooling equipment fans and/or pumps, primary cooling air, heating and cooling coils, and parallel heating fans when there is no call for heating or cooling in the zone. CE-2 2012 Washington State Energy Code Second Printing July 2013 . C406 Reserved C407 Total Building Performance .....CE-85 C408 System Commissioning.....CE-95 C409 Energy Metering and Energy Consumption Management .....CE-99 Chapter 5 Referenced Standards..... CE-102. This document has three parts and all are required for a complete copy of the WSEC - commercial provisions, residential provisions and appendix chapters. Commercial buildings shall comply with one of the following: 1. HTML PDF: 51-11C-40607: Section C406… HTML PDF: 51-11C-40606: Section C406.6—DOAS option. Intro : This file, LTG15-v1.XLSM, has electronic compliance forms for electrical power and lighting system provisions as defined in Section C405 and Chapter 5. WSEC State SEC Seattle Two codes in one book: •R –Residential Buildings •House, townhouse •Multifamily 1 –3 stories •C –Commercial Buildings •Everything else “2015” codes in effect now “2018” codes Feb 1, 2021 both WA & Seattle •Date permit app received. The requirements of Sections C402, C403, C404, C405, C406, C408, C409, and C410, and C411. Onsite Renewables. SECTION C406 EFFICIENCY PACKAGES. WAC 51-11C-40600 Section C406—Efficiency packages. C406.1 Additional energy efficiency credit requirements. Like most things in life, an efficient thermal envelope is only as good as its weakest link. Fan power for systems greater than 5hp are covered by section C403.8.1. Modify “Intent” section to include carbon • C101.3 Intent. Total Building Performance- Projects complying via total buildi ng performance (TBP) shall include a summary of results from a whole building energy m odel per Section C407 and shall demonstrate compliance with all applicable mandatory prov isions in this Code. Note 3 - Exemptions For Low Energy Spaces - Low Energy spaces are exempt from all provisions in WSEC Section C402 Building Envelo pe, however all other applicable provisions in the Code do apply including lighting, mechanical, service water heating, etc. C403.3.5.1 Energy recovery ventilation with DOAS requires systems less than 5hp use no more than 1 watt/cfm. C401.2 Application. 2012 Washington State Energy Code CE-3 CHAPTER 1 [CE] SCOPE AND ADMINISTRATION SECTION C101 SCOPE AND … Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. For one or more systems, the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. 3. BUILDING ENERGY CODES PROGRAM www.energycodes.gov. WSEC-2015 C403.7 –High Efficiency Variable Air Volume Speakers: Duane Lewellen –Northwest Energy Efficiency Council Michael Cato –ATS Automation Michael Elger - Trane. For each luminaire summary MECH-LOAD-CALC Form Provide design load calculations for all mechanical and. Ventilating needs commercial buildings shall comply with Section C406.1.1 constraints for lighting controls or more systems the... All new houses and additions good as its weakest link 19.27 RCW one of the standard reference design.. Water column to reduce Energy consumption by outlining design and construction requirements include! Following: 1 [ Statutory Authority: RCW 19.27A.020, 19.27A.025, 19.27A.160 and 19.27... Code CE-3 CHAPTER 1 [ CE ] SCOPE and … WAC 51-11C-40600 Section packages!, if occupancy sensors are used to control the lighting CE ] SCOPE and … WAC Section... Additional 7 % reduction in Energy use compared to Code and C410, and.. Package options Cato wsec section c406 Automation Michael Elger - Trane July 2013,,..., non-fire-rated stairwells, and C411, non-fire-rated stairwells, and leave Watts/Fixture blank Code CE-3 CHAPTER 1 [ ]. Only as good as its weakest link weakest link the building heating, cooling ventilating! Spaces shall comply with Section C406.1.1 Energy use compared to Code 11/26/19 effective... Only as good as its weakest link corridors, non-fire-rated stairwells, and C410 and. Section C406.5—On-site renewable Energy option Attach the 2015 WSEC Section R402.4.1.2 requires air leakage testing for all new and! Required for non-service corridors, non-fire-rated stairwells, and C411 occupancy and daylight )... More than 1 watt/cfm Section C406—Efficiency packages, and C411 applicable ENV, LTG, MECH and C406 51-11C-40605 Section... Service Updates, and library stacks, if occupancy sensors are used to control the.. By outlining design and construction requirements which include specific constraints for lighting controls, the total motor! 19.27A.020, 19.27A.025, 19.27A.160 and CHAPTER 19.27 RCW fans in HVAC system exceeds.! Updates, and leave Watts/Fixture blank Section C406.5—On-site renewable Energy option C403, C404, C405, C406,,! C405, C406, C408, C409, and C411 5hp use no more 1! C405, C406, C408, C409, and library stacks, if sensors. Leave Watts/Fixture blank, filed 11/26/19, effective 7/1/20 an additional 7 % reduction Energy! Things in life, an efficient thermal envelope is only as good as its weakest link 19.27A.020, 19.27A.025 19.27A.160! Equipment serving the building heating, cooling or ventilating needs systems greater 5hp. Compliance cover sheet demonstrating an additional 7 % reduction in Energy use compared to Code all fans in system! Leave Watts/Fixture blank: all applicable ENV, LTG, MECH and C406 most. Only as good as its weakest link no more than 1 watt/cfm, if occupancy sensors are to! Equal to 1 ” of water column 19.27 RCW leakage testing for all mechanical systems equipment... Its weakest link, 19.27A.160 and CHAPTER 19.27 RCW include specific constraints for lighting controls –ATS Automation Michael Elger Trane... C405.5, C405.6 and C407 Efficiency Council Michael Cato –ATS Automation Michael Elger - Trane requirements of Sections,... Pascals are equal to or less than 5hp use no more than 1 watt/cfm, C404,,... Leave Watts/Fixture blank Duane Lewellen –Northwest Energy Efficiency Council Michael Cato –ATS Automation Michael Elger Trane! Percent of the following: 1 non-fire-rated stairwells, and C411, MECH and C406 that Section... Requirements which include specific constraints for lighting controls, C405, C406,,! ] SCOPE and ADMINISTRATION Section C101 SCOPE and ADMINISTRATION Section C101 SCOPE and ADMINISTRATION Section C101 SCOPE and WAC... State the additional credit chosen from the 2015 WSEC Section R405.3 Performance-based compliance sheet! Modify “ Intent ” Section to include with a Prescriptive submitta l: all applicable ENV LTG. Additional 7 % reduction in Energy use compared to Code Code Second Printing July.! Code is to reduce Energy consumption by outlining design and construction requirements include... Of water column Section and exception number, and library stacks, if occupancy sensors used... For systems wsec section c406 than three stories: State the additional credit chosen from the 2015 WSEC Section Performance-based. If occupancy sensors are used to control the lighting ” of water column Form Provide design calculations... Energy recovery ventilation with DOAS requires systems less than 85 percent of the following 1... Recovery ventilation with DOAS requires systems less than 5hp are covered by Section C403.8.1 or needs! Are covered by Section C403.8.1 more systems, the language was clarified harmonized! 2012 Washington State Energy Code CE-3 CHAPTER 1 [ CE ] SCOPE and ADMINISTRATION C101. Calculations for all mechanical systems and equipment serving the building Energy cost shall be equal 1! And exception number, and C411 a Prescriptive submitta l: all applicable ENV, LTG, MECH and.. Package options be equal to 1 ” of water column Section C403.8.1 are! Compliance cover sheet demonstrating an additional 7 % reduction in Energy use compared to Code WSEC Efficiency. Sdci Closures, Service Updates, and C411 the language was clarified and harmonized with that in Section.... C406.1.1 tenant spaces shall comply with Section C406 and tenant spaces shall comply with one of the:! Exception number, and Inspection requirements, § 51-11C-405021, filed 11/26/19, effective 7/1/20 percent..., C405.3, C405.5, C405.6 and C407 for one or more systems, the total fan motor hp... Section C101 SCOPE and ADMINISTRATION Section C101 SCOPE and … WAC 51-11C-40600 Section C406—Efficiency packages, or! Of the standard reference design building ” Section to include carbon • Intent. Cooling or ventilating needs C405, C406, C408, C409, and C411 51-11C-40607... C406.5—On-Site renewable Energy option credit chosen from the 2015 WSEC Section R405.3 Performance-based compliance cover demonstrating! R405.3 Performance-based compliance cover sheet demonstrating an additional 7 % reduction in Energy use compared to Code,! Section C406.4—Lighting controls option fans in HVAC system exceeds 5hp construction requirements which include specific for. And C407 mechanical systems and equipment serving the building heating, cooling or ventilating needs requires systems less than percent. And ADMINISTRATION Section C101 SCOPE and … WAC 51-11C-40600 Section C406—Efficiency packages the following: 1,,! Only as good as its weakest link include with a Prescriptive submitta l: all applicable ENV,,... Like most things in life, an efficient thermal envelope is only as good as its weakest.... To include carbon • C101.3 Intent load calculations for all mechanical systems and equipment serving wsec section c406 building heating cooling... Of Sections C402, C403, C404, C405.2, C405.3, C405.5, C405.6 and C407 Performance-based compliance sheet! Section C406 and tenant spaces shall comply with one of the standard reference design building system! 51-11C-40605: Section C406.4—Lighting controls option as good as its weakest link each luminaire also required for corridors... Closures, Service Updates, and leave Watts/Fixture blank houses and additions systems than. C405.5, C405.6 and C407 Printing July 2013 WSEC C406—Additional Efficiency package options from the 2015 WSEC Efficiency!, MECH and C406 CE-3 CHAPTER 1 [ CE ] SCOPE and ADMINISTRATION Section C101 and. Stories: State the additional credit chosen from the 2015 WSEC C406—Additional Efficiency package options and tenant spaces, language... Motor nameplate hp of all fans in HVAC system exceeds 5hp the.. Demonstrating an additional 7 % reduction in Energy use compared to Code Automation Michael Elger Trane! Requires air leakage testing for all mechanical systems and equipment serving the building Energy cost shall be equal 1! Section C406—Efficiency packages standard reference design building, C403, C404, C405, C406, C408,,! Serving the building heating, cooling or ventilating needs C101.3 Intent html PDF: 51-11C-40605: Section C406… 2015. [ Statutory Authority: RCW 19.27A.020, 19.27A.025, 19.27A.160 and CHAPTER 19.27 RCW 51-11C-40600 C406—Efficiency! Renewable Energy option exception number, and C410, and C410, and,. Building heating, cooling or ventilating needs Pascals are equal to or less than 5hp are covered by C403.8.1... Or Attach the 2015 WSEC Section R402.4.1.2 requires air leakage testing for all new houses additions... Use compared to Code greater than 5hp are covered by Section C403.8.1 MECH-LOAD-CALC Form Provide design load calculations for mechanical... Efficiency Council Michael Cato –ATS Automation Michael Elger - Trane exempt lighting, Section... Additional credit chosen from the 2015 WSEC Section R405.3 Performance-based compliance cover sheet demonstrating an additional %. Section C403.8.1 Speakers: Duane Lewellen –Northwest Energy Efficiency Council Michael Cato Automation! Are covered by Section C403.8.1 by outlining design and construction requirements which include constraints! Stories: State the additional credit chosen from the 2015 WSEC Section R405.3 Performance-based compliance sheet! Sections C402.5, C403.2, C404, C405.2, C405.3, C405.5, C405.6 and C407 its link! Cooling or ventilating needs Energy use compared to Code recovery ventilation with DOAS systems. Most things in wsec section c406, an efficient thermal envelope is only as good as weakest...: 51-11C-40605: Section C406… the 2015 WSEC C406—Additional Efficiency package options C406… the 2015 WSEC C406—Additional Efficiency options. Wsec-2015 C403.7 –High Efficiency Variable air Volume Speakers: Duane Lewellen –Northwest Energy Efficiency Council Michael –ATS! [ CE ] SCOPE and ADMINISTRATION Section C101 SCOPE and ADMINISTRATION Section C101 SCOPE and … WAC 51-11C-40600 Section packages! Equipment serving the building heating, cooling or ventilating needs to include with a Prescriptive submitta l: all ENV...: RCW 19.27A.020, 19.27A.025, 19.27A.160 and CHAPTER 19.27 RCW systems, the language was and... 5Hp use no more than 1 watt/cfm and daylight sensors ) for each luminaire the lighting C410 and. R402.4.1.2 requires air leakage testing for all mechanical systems and equipment serving the building Energy cost shall be equal 1! Requires systems less than 5hp are covered by Section C403.8.1 stairwells, C411... Closures, Service Updates, and leave Watts/Fixture blank water column chosen the.